Engineering Division

Print
Press Enter to show all options, press Tab go to next option

The primary responsibility of the Engineering Division is the design and construction of the City's infrastructure (streets, water system, sewer system, storm drain system, park facilities, City buildings, and transportation/traffic systems), including the design and administration of the annual Capital Improvement Program.  To find out more about the City's Capital Improvement Program, including information on current and future Capital Improvement Plan projects, please refer to the navigation bar on the left or simply click here.

Engineering staff also provides support to the Community Development Department in reviewing private development proposals and their impact on City facilities and resources. Other responsibilities of Engineering include the review of proposals from other public agencies, review and approval of parcel maps, and the maintenance of record drawings, general element maps (zoning, water/sewer/storm drain, tract maps), aerial photographs, topographic maps, and survey data.

STATUS OF ENGINEERING DIVISION'S ACTIVE CAPITAL IMPROVEMENT PROJECTS

Current Active Projects - In Design Phase

  • Manhattan/Highland Improvement Project
  • Rosecrans/Sepulveda Bikeway Project
  • 13th Street Sewer Replacement Project
  • Cycle 1 Stormdrain Improvement Project
  • Parkview Avenue Sidewalk and Curb Ramp Project
  • Cycle 1 Sewer Maintenance Rehab Project
  • Citywide Traffic Signal Inventory and Downtown Traffic Signal Improvements
  • Fed Cycle 3 Safe Routes to School Project
  • State Cycle 10 Safe Routes to School Project
  • Fed Cycle 5 Highway Safety Improvement Project (HSIP)
  • Peck Ground Reservoir
  • Roundhouse Aquarium
  • Veterans Parkway  

Current Active Projects - In Construction           

  • Cycle 1 Storm Drain Catch Basin Connector Pipe Screen Project
    • Anticipated Start Date: 3/29/2017
    • Anticipated Completion Date: 6/30/2017   
  •  Highland Avenue and 38th Street 
    • Anticipated Start Date: 4/24/2017
    • Anticipated Completion Date: 6/30/2017
  • Laurel Avenue Storm Drain Catch Basin
    • Anticipated Start Date: 5/30/17
    • Anticipated Completion Date: 7/14/2017

Upcoming Projects

  • MBB, Oak, Redondo, 10th and 11th Street Resurfacing Project (Bid Opens 4/20/2017)
  • 3rd Street Improvement Project (Bid Opens 4/24/2017)
  • Parkview Improvements Between 1st Street and 8th Street (Bid Opens 5/18/2017)
  • Parking Lot No. 1 Retaining Wall Project (Bid Opens 08/14/2017)

Recently Completed Projects

  • Tennis and Basketball Courts Resurfacing and Restriping at Live Oak Park, Mira Costa High School, and Marine Avenue Park
  • Slurry Seal Area 2 & 3 Project
  • Parking Structure #2 Structural Rehabilitation
  • Pier Comfort Station Rehabilitation
  • Community Development Block Grant (CDBG) Citywide Curb Ramp Construction Project
  • Live Oak Park Wide Area Network and Wifi Fiber Optic Conduit Project
  • Parking Lot 2 Concrete Topping Slab
  • Marine Avenue Skate Park
  • Strand Stairs Rehabilitation Project
  • Pier Bollard Project
  • Pier Comfort Station Tile Mural and Sea Wall Tile