Marine Avenue Oil Pipeline Maintenance and Repair Work

Print
Press Enter to show all options, press Tab go to next option
PipePlains West Coast Terminals (PWCT) owns and operates an underground oil transmission pipeline along Marine Avenue from Aviation Boulevard to Elm Avenue.  PWCT is currently working at two locations on Marine Avenue approximately 300 feet west of Aviation Boulevard to perform necessary maintenance and repair of their pipeline.  The work at these two locations are primarily on the westbound travel way along Marine Avenue and is anticipated to be completed by early to mid-September 2017.  Travel lane closure is anticipated between 8:30 am and 3:30 pm Monday through Friday.  More work site locations along Marine Avenue are planned and the construction  timeline information will be forthcoming in the near future. Please stay tuned.  For more information, please contact Becky Sitton, Right of Way Agent for PWCT at (562) 728-2817.